Land Loans: Down Payments, Rates, and What to Check Before You Buy a Lot

A land loan finances a piece of ground with no house on it. It is the loan people discover they need after falling for a lot, and it is nothing like a mortgage: bigger down payment, higher rate, shorter term, often a balloon at the end, and a much shorter list of lenders willing to make one.

The reason is simple. A mortgage is secured by a house somebody wants to live in. A land loan is secured by dirt. If the borrower stops paying, the lender is left selling a lot in a market where buyers are scarce and no rental income exists in the meantime. Everything about land lending follows from that.

Why the mortgage market will not touch it

Fannie Mae’s Selling Guide is blunt: Fannie Mae does not purchase or securitize mortgages on vacant land or land development properties. Freddie Mac takes the same position. Because the loan cannot be sold into the secondary market, whoever makes it has to keep it on their own books, which means the terms are set by that lender’s own risk appetite rather than by a national rulebook.

That leaves four realistic sources:

  • Local banks and credit unions that hold loans in portfolio. Often the best terms, and often restricted to their own footprint.
  • Farm Credit System lenders, a network of cooperatives that lend on rural land. Texas Farm Credit, for example, publishes lot loans at 15% down for 15 years, 20% down for 20 years and 25% down for 25 years, with no balloon, limited to 40 acres or fewer outside city limits or in small communities, and requiring an intent to build.
  • The seller. Owner financing is common on land, and we cover the structures and risks in our owner financing guide.
  • A construction loan that includes the lot, which for most first-time buyers is the right answer and is covered below.

Raw, unimproved, improved: the three tiers

Lenders sort land by how close it is to being buildable, and the pricing follows.

  • Raw land has no utilities, no road access and no entitlements. Expect roughly 30% to 50% down.
  • Unimproved land has some access or partial utilities. Roughly 20% to 35% down.
  • Improved or finished lots have road frontage, water, sewer or a septic permit, and power at the line. Roughly 15% to 25% down.

Those ranges come from lender and industry sources rather than a regulator, but they line up with something official. The federal interagency real estate lending guidelines set supervisory loan-to-value limits that banks are expected to respect: 65% for raw land, 75% for land development, 85% for improved property and 85% for one-to-four family construction. Work those backwards and you get minimum down payments of about 35%, 25% and 15%. When a banker tells you 25% down on a lot, that number has a paper trail behind it.

On rates and terms, expect roughly 1 to 1.5 percentage points above a comparable home mortgage rate, terms of 5 to 20 years, and in many cases a balloon payment after 2 to 5 years with the balance amortized on a longer schedule. Credit expectations are higher too: lenders commonly look for scores around 700 and stay closer to a 43% debt-to-income ceiling. Ask every lender for the amortization period and the maturity date separately, because those are often not the same number.

A worked example

A finished lot at $80,000 with 25% down means $20,000 in cash and a $60,000 loan. At 8.25% over 15 years the payment is $582.08 a month, and you pay about $44,775 in interest over the full term. That payment counts in your debt-to-income ratio when you later apply for the construction or permanent loan, which is the part buyers forget: carrying the lot can shrink the house you qualify to build.

The government loan programmes, honestly

  • USDA Section 502 guaranteed: no standalone land purchase. The programme finances acquiring a site with a new or existing dwelling, and vacant land is expressly ineligible. Site-only debt can be refinanced, but only alongside interim construction financing to build. USDA’s single-close construction product does allow land acquisition or payoff as an eligible cost inside the construction package, with no down payment.
  • USDA Section 502 direct: covers buying, building or relocating a dwelling, with one narrow exception for refinancing debt incurred solely to buy the site.
  • VA: no standalone lot or raw-land loan. The guaranty attaches to a dwelling. A VA one-time-close construction loan can include the lot.
  • FHA Title I: there is a lot loan, but it is for manufactured housing. The current limit is $43,377 for a lot alone, for case numbers assigned on or after March 29, 2024. See our manufactured home loan guide.

One trap: the printed regulation at 24 CFR 201.10 still shows an old $16,200 figure, because HUD updates the limits by notice rather than by amending the text. Always check the current notice, not the code.

The better path for most buyers: one loan for lot and house

If you intend to build, a single-close construction-to-permanent loan usually beats buying the lot first. You close once, the lot purchase is folded into the loan, and the loan converts to a regular mortgage when the house is finished. Fannie Mae’s rules for single-closing transactions are specific:

  • If the transaction is a purchase, the borrower must not already own the lot at the first advance of interim financing.
  • If the borrower already owns the lot, the loan is treated as a limited cash-out refinance, and title must be held before the first advance. Cash-out refinances are not eligible.
  • No single construction period may exceed 12 months, and the total may not exceed 18 months from the note date.

FHA’s one-time close treats land equity as part of your minimum required investment, with a timing rule that matters: if you have owned the land six months or less, the lender uses the lesser of your acquisition cost or the appraised value; if you have owned it more than six months, or received it as a gift, the appraised value is used. Buy a lot cheaply and hold it a year, and the appreciation can become your down payment.

Our build vs. buy guide works through the total cost of a custom build, including the interest you pay during construction.

Due diligence: where land deals go wrong

A house comes with proof that it can be lived in. A lot does not. Before you remove contingencies, get answers in writing on all of these.

  • Zoning and minimum lot size. Confirm with the jurisdiction, not the seller’s listing, and ask about setbacks and building height.
  • Septic feasibility. If there is no sewer, you need a percolation test. A perc test averages about $1,300, typically $750 to $1,900. A failed perc test can make a lot unbuildable.
  • Water. A well runs roughly $5,000 to $10,000; a city water hookup $1,000 to $6,000.
  • Septic or sewer installation. A conventional septic system runs about $3,000 to $8,000, while aerobic or mound systems run $10,000 to $20,000, with an overall average near $8,021. A city sewer connection is $1,500 to $5,700. Permits alone can be $450 to $2,300.
  • Power and gas. Electric service starts around $1,000 and is often quoted at $5 to $15 per linear foot from the nearest pole. Gas runs $500 to $2,000. Bringing utilities to raw land totals roughly $6,500 to $30,000, averaging about $20,400.
  • Legal access. A lot reached by crossing someone else’s property needs a recorded easement, not a handshake. Ask about road maintenance agreements on private roads.
  • Flood and wetlands. Check the FEMA map and ask about wetlands delineation. See buying in a flood zone.
  • Mineral and water rights. In some states these are severed from the surface and belong to someone else.
  • Survey and title. Order a survey and a title search. Land carries more boundary and easement surprises than improved property. Our deed vs. title guide explains what a title commitment’s exceptions mean.
  • Impact and permit fees. NAHB put total regulatory costs at $131,734 per new single-family home in June 2026, about 26.4% of the price. Ask the building department for its current fee schedule before you budget.

Taxes: the deduction most buyers assume wrongly

Interest on a loan used to buy undeveloped land is not deductible as home mortgage interest, even if you intend to build. The IRS says so directly. Mortgage interest requires a qualified home, and bare ground is not one.

Once construction starts, the picture changes. Under IRS Publication 936, a home under construction can be treated as a qualified home for up to 24 months of construction, provided it becomes a qualified home when it is ready for occupancy. The period can begin any time on or after the date construction begins. If instead you are holding the land as an investment, the interest may fall under the investment interest rules, deductible only against net investment income with an indefinite carryforward.

Property tax treatment differs too. Homestead exemptions generally require a residence you occupy, so a vacant lot gets no exemption. Some agricultural special appraisals carry a rollback tax when the use changes: Texas, for example, recaptures the previous three years of tax savings on a change of use. Our homestead exemption guide covers the residence side.

None of this is tax advice for your situation. It is a list of questions to take to a tax professional before you close.

Questions to ask a land lender

Land loan terms are set lender by lender, so the only way to compare is to ask the same questions of each. Get written answers to these before you pay for an appraisal.

  • What is the maximum loan-to-value for this specific parcel, and how do you classify it: raw, unimproved or improved?
  • What is the amortization period, and separately, what is the maturity date? Is there a balloon, and if so, on what terms do you renew it?
  • Is the rate fixed for the full term, or does it reset? If it resets, off what index and with what caps?
  • Do you require an intent to build, and if so, within what period? Some rural lenders do.
  • Is there an acreage limit, a location restriction, or a requirement that the parcel be outside city limits?
  • Will you finance the same parcel into a construction loan later, and will the lot count as equity toward that down payment?
  • What appraisal do you require on bare land, and who pays if the appraisal comes in below the contract price?
  • Are there prepayment restrictions if I sell the lot or refinance into construction financing early?

That last question matters more than it sounds. Plenty of buyers finance a lot, then build two years later with a different lender, and a prepayment penalty on the land loan can eat the savings on the construction loan.


Frequently asked questions

How much down payment do I need for a land loan?

Typically 15% to 25% for a finished lot, 20% to 35% for unimproved land and 30% to 50% for raw land. Federal interagency guidelines set supervisory loan-to-value limits of 85% on improved property, 75% on land development and 65% on raw land, which is where those ranges come from.

Why are land loan rates higher than mortgage rates?

Because Fannie Mae and Freddie Mac will not buy loans on vacant land, so lenders keep them on their own books and price for the risk of reselling ground with no house on it. Expect roughly 1 to 1.5 percentage points above comparable mortgage rates, shorter terms and sometimes a balloon.

Can I use an FHA, VA or USDA loan to buy land?

Not on its own. USDA finances a site with a dwelling, VA requires a dwelling, and FHA’s Title I lot loan is for manufactured housing, currently capped at $43,377 for a lot. All three can finance land as part of a construction loan.

Is it better to buy the lot first or use a construction loan?

If you plan to build soon, a single-close construction-to-permanent loan is usually cheaper and simpler: one closing, the lot folded in, and conversion to a mortgage at completion. Buying the lot first adds a payment that counts against your debt-to-income ratio when you apply to build.

Is land loan interest tax deductible?

Not as home mortgage interest while the land is undeveloped. Once construction begins, the home under construction can qualify for up to 24 months. Land held for investment may fall under the investment interest rules instead.

What should I check before buying a lot?

Zoning and setbacks, a percolation test if there is no sewer, the cost of water, septic, power and gas, legal recorded access, flood and wetland status, mineral rights, a survey and title search, and the building department’s impact and permit fees.